Assembling
[Update]
This is a very memorable assembling process. Why?
I was working on this during the worst haze I have experience in my life!
Haze reaching levels of being hazardous to health...
My entire house was on air conditioning for the entire week!
Not only that... I had a bad fall and was recovering from 3 broken ribs.
Yet the drive to complete this is still high!
Day 1: Assembling the head with LEDs
|
Looking at the wires can tell the viewer that I am no expert in wiring... |
|
This is really small to have all the wires in. Opps! I forgot to pain the details at the back! |
|
Comparing a 1/144 and a 1/35. |
Day 2: Assembling the lower neck with LEDs
|
I know.. its ugly and not organised.. |
|
Cover it and the unsightly wiring is gone. But its not easy to put the top on. Some minor modification required. |
|
The spring provided to wrap the wires had a diameter too small for 3 wires. |
|
The cover is up. I'm done for the day! |
Day 3: Attaching the lower neck to the base
|
Too tired. And the Haze has reached a hazardous level again. Better rest... |
Day 4: Final assembly
|
Yes!!! Its almost done! The base still needs some work. |
I will be posting more pictures and a video on its lighting effect. Stay tune.